Loading...
HomeMy WebLinkAbout0120044-Building (windows) o OSHKOSH ON THE WATER Job Address 421 STANLEY AVE CITY OF OSHKOSH No 120044 BUILDING PERMIT - APPLICATION AND RECORD Owner MR/MRS JEFFREY J TYRIVER Create Date 06/14/2006 Designer Contractor MARC'S REMODELING Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. D Projection I Unfinished/Basement Finished/Living Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Not Required Flood Plain # Dwelling Units o Height Permit # Structures Park Dedication o Use/Nature SFR/ Installing 14 replacement windows and replacing an existing patio door. Installing new base and casing in the living room. of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation ./_ Issued By: _Ul/~ $9,500.00 Plan Approval $0.00 Permit Fee Paid $74.00 Park Dedication $0.00 Date 06/14/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1209130000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described i? this p "t applicatio ~t in a asement, the City strongly urges the permit applicant to contact the easement holder(s) arl9 to s r any neces ppr v Is before starting such activity. Signature . Date '-..Olo J I <f /(j h AgenUOwner -r-- Address 1805 MARQUETTE AVE OSHKOSH WI 54901 - 0000 Telephone Number 920-426-0671 OR 411 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.