Loading...
HomeMy WebLinkAbout0120026 P e OSHKOSH ON THE WATER Job Address 1302 ONTARIO ST CITY OF OSHKOSH No 120026 PLUMBING PERMIT - APPLICATION AND RECORD Owner MICHAEL AlTAMMY L BROWN Create Date 06/14/2006 Category 410 - Residential-I nterior Plan Contractor M P KELLY Shower Water Softner Wait. St. Shamp Sink Floor Drain Local Waste Ice Chest FlrlWst Sink Lnciry Tray Clothes Wshr Exam Sink Catch Basin Disposal Bidet Sculry Sink Wash Ftn Dishwasher Beer Tap Hand Sink Urinal Sump Pump Lab Sink Plaster Sink Standp Rec Classrm Sink Sterilizer Surgeons Sink Ice Maker Breakrm Sink Dip Well F Prep Sink Gar Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work ~FR / REPLACE TOILET -- - - Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1208240000 $20.00 0 Permit Voided I $0.00 Valuation -- WO Issued BY~ Permit Fees Plan Approval Date 06/1~/2006 In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Date Signature Agent/Owner OSHKOSH WI 54901 - 4431 Telephone Number 231-1750 Address 665 N MAIN ST To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.