Loading...
HomeMy WebLinkAbout0120027-Plumbing (water heater) e OSHKOSH ON THE WATER Job Address 19 E IRVING AVE CITY OF OSHKOSH PLUMBING PERMIT- APPLICATION AND RECORD Owner RUTH L GERTH Contractor M P KELLY Category 441 -Industrial-Water Heaters Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind WaterSoftner Wait. St. Shamp Sink Local Waste Ice Chest Flr/Wst Sink Clothes Wshr Exam Sink Catch Basin Bidet Sculry Sink Wash Ftn Beer Tap Hand Sink Urinal Lab Sink Plaster Sink Standp Rec Sterilizer Surgeons Sink Ice Maker Dip Well F Prep Sink Gar Drain Drink Ftn Serv Sink Soda Disp No 120027 Create Date 06/14/2006 Plan Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye WashStatn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs COMM / REPLACE GAS WATER HEATER Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 0402430000 Valuation $449.22 Plan Approval Issued By ~W $0.00 Permit Fees $20.00 0 Permit Voided I Date 06/14/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 665 N MAIN ST OSHKOSH WI 54901 - 4431 Telephone Number 231-1750 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.