Loading...
HomeMy WebLinkAbout0120037-Plumbing (laterals) o OSHKOSH ON THE WATER Job Address 3111 ELK RIDGE DR CITY OF O~HKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 120037 OWner MIDWEST GENERAL CONTRACTORS Create Date 06/14/2006 Contractor RADTKE CONTRACTORS INC Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Category 430 - Industrial-Exterior (laterals) Plan Shower Water Softner Wait. St. Floor Drain Local Waste Ice Chest Lndry Tray Clothes Wshr Exam Sink Disposal Bidet Sculry Sink Dishwasher Beer Tap Hand Sink Sump Pump Lab Sink Plaster Sink Classrm Sink Sterilizer Surgeons Sink Breakrm Sink Dip Well F Prep Sink Ejector/Grind Drink Ftn Serv Sink Shamp Sink FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Use/Nature 4" SANITARY AND 2" WATER LATERALS **DEBIT ACCT of Work Valuation Size Material Plastic Sanitary Sewer 4" Storm Sewer Water Service 2" Plastic Type Lateral # Conn. Type New $2,000.00 Plan Approval $0.00 Permit Fees Parcel Id # Issued By Lateral New Date 06/14/2006 $100.00 0 Permit Voided I In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 6408 CROSS RD WINNECONNE WI 54986 - 9731 Telephone Number (920) 582-4114 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.