Loading...
HomeMy WebLinkAbout0120021-Plumbing (water heater) o OSHKOSH ON THE WATER Job Address 322 W 9TH AVE CITY OF OSHKOSH No 120021 PLUMBING PERMIT - APPLICATION AND RECORD Owner CRAIG R PASKE Create Date 06/14/2006 Plan Contractor M P KELLY Category 411 - Residential-Water Heaters Bathtub Shower Water Softner Wait. St. Shamp Sink Whirlpool Floor Drain Local Waste Ice Chest Flr/Wst Sink Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Toilet Disposal Bidet Sculry Sink Wash Ftn Res. Sink Dishwasher Beer Tap Hand Sink Urinal Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Misc. Fixtures Use/Nature RENTAL / REPLACE GAS WATER HEATER of Work Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Size Conn. Type Material Type # Sanitary Sewer Storm Sewer Water Service Valuation $800.00 Plan Approval Issued By ~l A) $0.00 Permit Fees $20.00 0 Permit Voided I Parcelld # 0903150000 Date 06/14/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 665 N MAIN ST OSHKOSH WI 54901 - 4431 Telephone Number 231-1750 To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.