HomeMy WebLinkAbout0119996-Building (windows)
o
OSHKOSH
ON THE WATER
Job Address 1915 WHITE SWAN DR
CITY OF OSHKOSH No 119996
BUILDING PERMIT - APPLICATION AND RECORD
Owner JOSEPH/PATRICIA M HILMER Create Date 06/13/2006
Designer
Contractor LUECKS HOME IMPROVEMENT INC
Category
141 - Exterior Remodeling Plan
Type
. Building
o Sign
o Canopy o Fence o Raze
Class of Const: Size
Rooms Height Ft. D Projection I
-
Bedrooms Stories Canopies
-
Baths Signs
Zoning
Unfinished/Basement
Sq. Ft.
Finished/Living
Sq. Ft.
Garage
Sq.Ft.
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit
Flood Plain
Height Permit
# Dwelling Units
o
# Structures
o
Park Dedication
Use/Nature SFR / REPLACE 14 VINYL WINDOWS AND 2 PATIO DOORS SAME SIZE SAME LOCATION, NO STRUCTURAL CHANGES
of Work
Plumbing Contractor
HV AC Contractor
Electric Contractor
Fees: Valuation $18,423.00 Plan Approval
Issued By: ~ ~
$0.00 Permit Fee Paid
$119.00 Park Dedication
$0.00
Date 06/13/2006
Final/D.P. 00/00/0000
o Permit Voided I
Parcelld # 1523790000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permjt applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
706 S MAIN STREET
Agent/Owner
OSHKOSH
WI 54902 - 6084
Telephone Number
235-0106
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.