HomeMy WebLinkAbout0119967-Plumbing (laterals)
o
OSHKOSH
ON THE WATER
Job Address 3355 JACKSON ST
PLUMBING PERMIT - APPLICATION AND RECORD
CITY OF OSHKOSH No 119967
Owner RAR INVESTMENTS LLC Create Date 06/09/2006
Plan
Contractor W&D NAVIS,INC
Category 430 - Industrial-Exterior (laterals)
Bathtub Shower Water Softner Wait. St. Shamp Sink
Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink
Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin
Toilet Disposal Bidet Sculry Sink Wash Ftn
Res. Sink Dishwasher Beer Tap Hand Sink Urinal
Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec
Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker
Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain
Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp
Misc.
Fixtures
Coffee Maker
Int Grease Trap
4 Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Storm lateral and catch basins for new auto dealership.**Check #1279
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer 10" Plastic Lateral 1 New
Water Service
Parcelld #
Use/Nature
of Work
Valuation
$26,680.00 Plan Approval
$0.00 Permit Fees
$78.00 D Permit Voided I
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an seme. Ci st n rges the permit applicant to contact the
easement holder(s) and to secure any ne ssary ap' ovals mg such activity.
Signature
Issued By
Address PO BOX 48
Date 06/09/2006
Date
ro/(/CJC
WI 53963 - 0000 Telephone Number 1-920-324-8995
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.