Loading...
HomeMy WebLinkAbout0119967-Plumbing (laterals) o OSHKOSH ON THE WATER Job Address 3355 JACKSON ST PLUMBING PERMIT - APPLICATION AND RECORD CITY OF OSHKOSH No 119967 Owner RAR INVESTMENTS LLC Create Date 06/09/2006 Plan Contractor W&D NAVIS,INC Category 430 - Industrial-Exterior (laterals) Bathtub Shower Water Softner Wait. St. Shamp Sink Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Toilet Disposal Bidet Sculry Sink Wash Ftn Res. Sink Dishwasher Beer Tap Hand Sink Urinal Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Misc. Fixtures Coffee Maker Int Grease Trap 4 Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Storm lateral and catch basins for new auto dealership.**Check #1279 Size Material Type # Conn. Type Sanitary Sewer Storm Sewer 10" Plastic Lateral 1 New Water Service Parcelld # Use/Nature of Work Valuation $26,680.00 Plan Approval $0.00 Permit Fees $78.00 D Permit Voided I In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an seme. Ci st n rges the permit applicant to contact the easement holder(s) and to secure any ne ssary ap' ovals mg such activity. Signature Issued By Address PO BOX 48 Date 06/09/2006 Date ro/(/CJC WI 53963 - 0000 Telephone Number 1-920-324-8995 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.