Loading...
HomeMy WebLinkAboutPW CNT 05-05/Cng Ord #1 CHANGE ORDER # 1 DATED: TO: Vinton Construction Company P. O. Box 1987 Manitowoc, WI 54221-1987 Your present contract with the City of Oshkosh, Contract No. and changed as follows: 05-05 , is hereby amended NET INCREASE TO SECTION I - CONCRETE PAVING: NET INCREASE TO SECTION 1- QUOTE FOR S.T.H. "44" & UNIVERSAL DR: NET INCREASE TO SECTION III - SANITARY SEWER: $13,288.33 $8,481.35 $5,800.64 NET INCREASE TO CONTRACT: $27,570.32 BY: CITY OF OSHKOSH r;;Y// ~ City Manager ~ MKJJtb- ity Clerk Recommended: b ,f) " / ~.. (",,,...1 c... I /., "'-/ Director of Publ c Works Approved and accepted: c=:~-~ ~ 10~~ F Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. ~Q, >c' ~ {j ~V Comptroller A~prjVed as to form: CONTRACT: 05-05 PART I - CHANGE ORDER # 1 ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION I ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 1 Mill & haul asphalt pavement on Melvin Avenue, lump sum 1.00 1.00 $1,243.33 $1,243.33 2 Provide 3 days of message board for Ohio St. closure and Irving Avenue closure, I per dav 3.00 3.00 $175.00 $525.00 3 Provide and install approx. 6000 sq. yds. Urban, Class I, Type A, Erosion Mat, per sq. vard. 6,000.00 6,000.00 $1.92 $11,520.00 ADDITIONAL WORK SECTION I - (BID ITEMS 1 -3) - SUB-TOTALS $13,288.33 $0.00 QUOTE FOR CONCRETE PAVING S.T.H. "44" AND UNIVERSAL DRIVE INTERSECTION: C.O. #1 - SECTION I ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 1. Approx. 28 square yards of pavement removal, complete as specified, per square yard 28.00 28.00 $10.80 $302.40 2. Approx. 40 cubic yards of excavation, complete as soecified, oer cubic yard 40.00 40.00 $26.00 $1,040.00 3. Approx. 108 square yards of 9" non-reinforced H.E.S. concrete pavement, including integral curb and grading with 6" base, complete as specified, per square yard 108.00 108.00 $43.30 $4,676.40 4. Approx. 97.7 linear feet of 12" radius curb & head, complete as specified, per linear foot 97.70 97.70 $2.00 $195.40 5. Approx. 176.9 linear feet of sawing, complete as specified, per linear foot 176.90 176.90 $3.50 $619.15 6. Furnish and install approx. 64 pavement ties, complete as specified, each 64.00 64.00 $7.00 $448.00 Page 1 CONTRACT: 05-05 PART I - CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 7. Furnish, install and maintain all necessary traffic control as outlined in the plan documents, lump sum 1.00 1.00 $800.00 $800.00 8. Terrace work, including rough backfill, 4" topsoil, fertilizing, seeding, and mulchina, lumo sum 1.00 1.00 $400.00 $400.00 QUOTE FOR S.T.H. "44" & UNIVERSAL DR: C.O. # 1 - (ITEMS 1 - 8) . SUB-TOTAL $8,481.35 $0.00 $21,769.68 NET INCREASE TO SECTION I - ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION III ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 1 Dig test holes to determine elevation of sanitary laterals to 1509 and 1607 Georgia Street on Florida Avenue side, lump sum 1.00 1.00 $383.00 $383.00 2 Assist Water Department to move existing water main on Ohio Street south of box storm sewer, 5/18/05, lumo sum 1.00 1.00 $1,618.00 $1,618.00 3 Resaw manhole connection at new manhole at 12th Avenue and Ohio Street to new elevation, 5/19/05, lump sum 1.00 1.00 $418.60 $418.60 4 Repaired storm sewer crossing on W. South Park Avenue that are was not shown on plans, 5/24/05, lumo sum 1.00 1.00 $1,033.50 $1,033.50 5 Dug stumps for city and hauled debris out on W. South Park Avenue, 5/25/05, lump sum 1.00 1.00 $374.50 $374.50 Page 2 CONTRACT: 05-05 PART I - CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 6 Installed and removed flexible sanitary sewer connection during water main construction at W. 19th Avenue and Iowa Street intersection, 6/2/05 and 6/5/05, lumo sum 1.00 1.00 $549.19 $549.19 7 Modify new sanitary manhole at Iowa Street and W. 20th Avenue due to different conditions, 6/2/05, lumo sum 1.00 1.00 $820.85 $820.85 8 Installed temporary sanitary connection due to conflict with water main on Georgia Street and Florida Avenue, 6/21/05, lump sum 1.00 1.00 $121.50 $121.50 9 Adjusted sanitary connections to MH FA51 on Florida Street due to water elevations, 6/22/05 1.00 1.00 $121.50 $121.50 10 Removed old sanitary lateral which crossed through existing storm at 1642 Georgia Street, 7/5/05, lumo sum 1.00 1.00 $360.00 $360.00 ADDITIONAL WORK: C. O. # 1 - (ITEMS 1 - 8) - SUB-TOTAL $5,800.64 $0.00 $5,800.64 NET INCREASE TO SECTION III - NET INCREASE TO SECTIONS I, III $27,570.32 $27,570.32 NET INCREASE TO CONTRACT: Page 3