Loading...
HomeMy WebLinkAbout0119946 B e OSHKOSH ON THE WATER Job Address 742 OAK ST CITY OF OSHKOSH No 119946 BUILDING PERMIT - APPLICATION AND RECORD Owner WAYNE A MORGAN JRlS MOLlNSKI Create Date 06/08/2006 Designer Contractor UNLICENSED - UNKNOWN Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. D Projection I Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units o # Structures o Use/Nature fFRI Tear-off roofing, including cedar shingles, install new sheathing over spaced roofing boards, an install new asphalt shingles. No of Work Structural Changes -- Any additional value of work will require additional permits. HV AC Contractor Plumbing Contractor Electric Contractor 6,500.00 Plan Approval $0.00 Permit Fee Paid $56.00 Park Dedication $0.00 Issued By: Date 06/08/2006 FinallO.P. 00/00/0000 D Permit Voided I Parcelld # 1105330000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this per . application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to s '~re e a ovals before starting such activity. # Signature Date ? ~ tJ AgenUOwner '. Address OSHKOSH WI 54902 - 5603 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.