Loading...
HomeMy WebLinkAbout0119919-Plumbing (repair water service) e OSHKOSH ON THE WATER Job Address 1207 HIGH AVE CITY OF OSHKOSH No 119919 PLUMBING PERMIT - APPLICATION AND RECORD Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Owner 1207 HIGH AVENUE LLC Create Date 06/07/2006 Category 401 - Residential-Exterior (laterals) Plan Water Softner Wait. St. Shamp Sink Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn . Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Contractor FREUND EXCAVATING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature REPAIR WATER SERVICE of Work Valuation Issued By Size # Material Type Conn. Type Sanitary Sewer Storm Sewer Water Service 1" Copper Lateral Repair . Parcelld # 1202670000 $1,500.00 Plan Approval $0.00 Permit Fees $50.00 D Permit Voided I Date 06/07/2006 In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Os kosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work described in this p it application within an easement, the City strongly urges the permit applicant to contact the easement holder nd to seclJl"e an ssary approvals efore starting such activity. Signature 6 -7 -06 Date Agent/Owner aMRa Address 3135 DELHI RD WI 54963 - 0000 Telephone Number 920-685-2196 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.