Loading...
HomeMy WebLinkAbout0119932-Building (roof) G OSHKOSH ON THE WATER Job Address 820 CONCORDIA AVE CITY OF OSHKOSH No 119932 BUILDING PERMIT - APPLICATION AND RECORD Owner SHARON M WEISHEIPL Create Date 06/06/2006 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy Class of Const: o Fence o Raze Zoning Size '.:. Unfinished/Basement Sq. Ft. Rooms Height Ft. D Projection I FinishedlLiving Sq.Ft. Sq.Ft. Bedrooms Stories Canopies Signs Garage Baths Foundation 0 Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier . Other o Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature SFR - Reroof. Tear off and reshingle. Install new felt, flashing, drip edge and shingle. of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $3,000.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Issued By: ~~ , Date 06/07/2006 FinaIlO.P. 00/00/0000 D Permit Voided I Parcelld # 1310330000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement h~lder(S) and to.}~1.i1e~y necessa~ approv~~~fo;re st?rting such activity. ! i Signature /' // la?r;')- h? JUJ ~'>';IP Date 0:- L7 / () ~> ( f/ / - l- ,/ Agent/Owner . . >..~._ _ Address 2347 ASHLAND ST Oshkosh WI 54901 - 0000 Telephone Number ~3 ./'-:5 :sf?' To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.