HomeMy WebLinkAbout0119887-Plumbing (lawn irrigation system)
e
OSHKOSH
ON THE WATER
Job Address 2990 UNIVERSAL ST
CITY OF OSHKOSH
No
119887
PLUMBING PERMIT - APPLICATION AND RECORD
Owner MIDWEST REAL ESTATE DEVELOPMENT CO Create Date 06/06/2006
Contractor WATTERS PLUMBING
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Category 440 - Industrial-Interior
Plan
Shower
Water Softner
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Wait. St.
Shamp Sink
FlrlWst Sink
Catch Basin
Wash Ftn
Urinal
Standp Rec
Ice Maker
Gar Drain
Soda Disp
Floor Drain Local Waste Ice Chest
Lndry Tray Clothes Wshr Exam Sink
Disposal Bidet Sculry Sink
Dishwasher Beer Tap Hand Sink
Sump Pump Lab Sink Plaster Sink
Classrm Sink Sterilizer Surgeons Sink
Breakrm Sink Dip Well F Prep Sink
Ejector/Grind Drink Ftn Serv Sink
BACKFLOW DEVICE FOR LAWN IRRIGATION SYSTEM
Use/Nature INSTALL METER AND VACUUM BREAKER FOR LAWN IRRIGATION SYSTEM "DEBIT ACCT
of Work
Valuation
Issued By
Size
#
Conn. Type
Material
Type
Sanitary Sewer
Storm Sewer
Water Service
Parcel Id #
1329401200
$300.00 Plan Approval
$0.00 Permit Fees
$20.00 D Permit Voided I
Date 06/06/2006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
AgenUOwner
Address PO BOX 118
MENASHA
WI 54952 - 0118 Telephone Number 920-733-8125
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.