HomeMy WebLinkAbout0119898-Building (windows)
e
OSHKOSH
ON THE WATER
Job Address 1519 JEFFERSON ST
CITY OF OSHKOSH No 119898
BUILDING PERMIT - APPLICATION AND RECORD
Owner KIA YANG/NENG XIONG Create Date 06/06/2006
Designer
Contractor WINDOW WORLD OF MILWAUKEE
Category
141 - Exterior Remodeling Plan
Type
. Building
o Sign
o Canopy o Fence o Raze
Class of Const: Size
Rooms Height Ft. D Projection I
-
Bedrooms Stories Canopies
-
Baths Signs
Zoning
Sq. Ft.
Sq. Ft.
Sq. Ft.
Unfinished/Basement
Finished/Living
Garage
Foundation . Poured Concrete 0 Floating Slab o Pier o Other
o Concrete Block o Post o Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature DUPLEX /INSTALLlNG 21 VINYL REPLACEMENT WINDOWS IN EXISTING OPENINGS / NO STRUCTURAL CHANGES
of Work
HV AC Contractor
Plumbing Contractor
Electric Contractor
$4,370.00 Plan Approval
$0.00 Permit Fee Paid
$44.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
/?:}L\:J
Date 06/06/2006
Final/D.P. 00/00/0000
D Permit Voided I
Parcelld # 1505510000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 235 MORRIS ST
FOND DU LAC
WI 54935 - 0000 Telephone Number 920-923-4189
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.