Loading...
HomeMy WebLinkAbout0119893-Plumbing e OSHKOSH ON THE WATER Job Address 3179 HAYWARD AVE Contractor OWNER Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work CITY OF OSHKOSH No 119893 PLUMBING PERMIT - APPLICATION AND RECORD Owner MICHAEL J BRECHlIN/L1SA A PEPPLER Create Date 06/05/2006 Category 410 - Residential-Interior Plan Water Softner Wait. St. Shamp Sink Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind ~FRI LATE PERMIT/ Basement bathroom. Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1342930000 $0.00 $21.00 D Permit Voided I Valuation C.. . $1 '~OO.~ ~Plan Approval Issued By 6'rvv'v In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit a plicati n within an easement, the City strongly urges the permit applicant to contact the easement holder(s an 0 sec e an necessary approvals before starting such activity. --~-~""".---'-----..-- Address 3179 HAYWARD AVE Signature Permit Fees Date 06/06/2006 ~-:& Date Agent/Owner OSHKOSH WI 54904 - 0000 Telephone Number ;rZf~c;? 5; To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (I.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue ifthe inspection is not performed within two business days from the time the project is ready.