Loading...
HomeMy WebLinkAbout0119916-Plumbing (water heater) e OSHKOSH ON THE WATER Job Address 220 FULTON AVE CITY OF OSHKOSH No 119916 PLUMBING PERMIT - APPLICATION AND RECORD Owner CRAIG/AMY/STEVE LEACH Create Date 06/06/2006 Plan Contractor KOCH PLUMBING Category 411 - Residential-Water Heaters Shower Water Softner Wait. St. Floor Drain Local Waste Ice Chest Lndry Tray Clothes Wshr Exam Sink Disposal Bidet Sculry Sink Dishwasher Beer Tap Hand Sink Sump Pump Lab Sink Plaster Sink Classrm Sink Sterilizer Surgeons Sink Breakrm Sink Dip Well F Prep Sink Ejector/Grind Drink Ftn Serv Sink Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature SFR / REPLACE GAS WATER HEATER **DEBIT ACCT of Work Shamp Sink FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye WashStatn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Size Material Sanitary Sewer Storm Sewer Water Service Type # Conn. Type Valuation $600.~ \ Plan Approval ~VU $0.00 Permit Fees Parcelld # 1000820000 $20.00 D Permit Voided I Issued By Date 06/06/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 2005 DOTY ST OSHKOSH WI 54902 - 0000 Telephone Number 920-231-6661 or 235 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.