Loading...
HomeMy WebLinkAbout0119866 B e OSHKOSH ON THE WATER Job Address 507 JACKSON ST CITY OF OSHKOSH No 119866 BUILDING PERMIT - APPLICATION AND RECORD Owner DAVID J/MARY SCHULTZ Create Date 06/05/2006 Designer Contractor OWNER Category 1~1 - Exterior Remodeling Plan Type . _ Building o Sign __ 0 Can9P~____ 0 Fence Class of Const: o Raze -__I Zoning Size Unfinished/Basement Sq.Ft. Sq. Ft. Sq.Ft. Rooms Height Ft. o Projecti~n! Finished/Living Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature ~FR / REPALCE 10 WINDOWS SAME SIZESAME locATI6i'f~6 STRUCTURAL CHANGES of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $4,700.00 Plan Approval _ Issued By: ~ ~ $0.00 Permit Fee Paid $44.00 Park Dedication $0.00 -'-- --- .--- Date 06/05/2006 Final/O.P. 00/00/0000 O_P~rmit Voided. Parcelld # 0702270000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date AgenUOwner OSHKOSH WI 54901 - 4342 Telephone Number ------..- --.- - ~---- --,--- ------ Address 507 JACKSON ST To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.