Loading...
HomeMy WebLinkAbout0119872-Building (siding/garage roof) e OSHKOSH ON THE WATER Job Address 33 EVELINE ST CITY OF OSHKOSH No 119872 BUILDING PERMIT - APPLICATION AND RECORD Owner MICHAELfTHERESA EIERMAN Create Date 06/05/2006 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. o Projection I Finished/Living Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature RENTAU Installing vinyl siding on the house and re-roofing the garage (installing a layer of shingles over the existing layer). This permit of Work ,does not include any electrical work. HV AC Contractor Plumbing Contractor Electric Contractor Fees: valu~ ' Issued By: I ~ $3,900.00 Plan Approval $0.00 Permit Fee Paid $38.00 Park Dedication $0.00 Date 06/05/2006 Final/O.P. 00/00/0000 o Permit Voided I Parcelld # 0804510000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) pnd to secure ne f ~ovals before starting such activity. ~_ Signature tv---- - DateS C?G Agent/Owner ' OSHKOSH WI 54901 - 1375 Telephone Number Address To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.