HomeMy WebLinkAbout0119872-Building (siding/garage roof)
e
OSHKOSH
ON THE WATER
Job Address 33 EVELINE ST
CITY OF OSHKOSH No 119872
BUILDING PERMIT - APPLICATION AND RECORD
Owner MICHAELfTHERESA EIERMAN Create Date 06/05/2006
Designer
Contractor OWNER
Category
141 - Exterior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement
Sq.Ft.
Sq.Ft.
Sq.Ft.
Rooms
Height
Ft.
o Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier
o Treated Wood
o Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature RENTAU Installing vinyl siding on the house and re-roofing the garage (installing a layer of shingles over the existing layer). This permit
of Work ,does not include any electrical work.
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: valu~ '
Issued By: I ~
$3,900.00 Plan Approval
$0.00 Permit Fee Paid
$38.00 Park Dedication
$0.00
Date 06/05/2006
Final/O.P. 00/00/0000
o Permit Voided I
Parcelld # 0804510000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) pnd to secure ne f ~ovals before starting such activity. ~_
Signature tv---- - DateS C?G
Agent/Owner '
OSHKOSH
WI 54901 - 1375 Telephone Number
Address
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.