HomeMy WebLinkAbout0119854-Building (remodel rear entry)
e
OSHKOSH
ON THE WATER
Job Address 561 EVANS ST
CITY OF OSHKOSH No 119854
BUILDING PERMIT - APPLICATION AND RECORD
Owner CRYSTAL A DELWICHE Create Date 06/05/2006
Designer
Contractor OWNER
Category
140 - Interior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq.Ft. Rooms Height Ft.
Finished/Living Sq.Ft. Bedrooms Stories
Garage Sq.Ft. Baths
Foundation . Poured Concrete 0 Floating Slab o Pier o Other
o Concrete Block o Post o Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
----- ~---
D Projection I
Canopies
Signs
Use/Nature
of Work
FRI Remodeling the rear entry- replacing the storm and screen door, replastering and repaint entryway, replace door to kitchen and one
indow in the kitchen and new flooring.
HV AC Contractor
Plumbing Contractor
Electric Contractor
Issued By:
Fees; Valuation $1,000.00
~-
Plan Approval
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0.00
Date 06/05/2006
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1102690000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature r- \ '.,'~ ,qr~*: (~" () it D L J .{tJ,.e,
\ Agent/Owner
Date
WS-/D~i
Address 561 EVANS ST
OSHKOSH
WI 54901 - 4603 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.