HomeMy WebLinkAbout0119854-Building (remodel rear entry) e OSHKOSH ON THE WATER Job Address 561 EVANS ST CITY OF OSHKOSH No 119854 BUILDING PERMIT - APPLICATION AND RECORD Owner CRYSTAL A DELWICHE Create Date 06/05/2006 Designer Contractor OWNER Category 140 - Interior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Rooms Height Ft. Finished/Living Sq.Ft. Bedrooms Stories Garage Sq.Ft. Baths Foundation . Poured Concrete 0 Floating Slab o Pier o Other o Concrete Block o Post o Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 ----- ~--- D Projection I Canopies Signs Use/Nature of Work FRI Remodeling the rear entry- replacing the storm and screen door, replastering and repaint entryway, replace door to kitchen and one indow in the kitchen and new flooring. HV AC Contractor Plumbing Contractor Electric Contractor Issued By: Fees; Valuation $1,000.00 ~- Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Date 06/05/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1102690000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature r- \ '.,'~ ,qr~*: (~" () it D L J .{tJ,.e, \ Agent/Owner Date WS-/D~i Address 561 EVANS ST OSHKOSH WI 54901 - 4603 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.