Loading...
HomeMy WebLinkAbout0119874 B o OSHKOSH ON THE WATER Job Address 702 W 20TH AVE CITY OF OSHKOSH No 119874 BUILDING PERMIT - APPLICATION AND RECORD Owner JACOB W/KRISTINE E FISCHER Create Date 06/05/2006 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. D Projection I Finished/Living Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature SFR/ Replacing and repairing sections of the foundation walls. Two 4'x4' stoops will be installed for exits. * The stoops will have a of Work minimum of 48" of frost protection. The City of Oshkosh has not approved or reviewed the repairs that will be made to the foundation such as the installation of the I-beams. It is the owner's/contractors responsibility to design the repairs. HV AC Contractor Plumbing Contractor Electric Contractor Fees: valuation"y_,_ Issued By: t\)liC'-. $2,000.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Date 06/05/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcel Id # 1408720000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure an ss ovals before starting such activity. Agent/Owner OSHKOSH D,l, ~ Signature Address WI 54902 - 6703 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.