HomeMy WebLinkAbout0119806-Building (egress window)
o
OSHKOSH
ON THE WATER
Job Address 1255 FAIRFAX ST
CITY OF OSHKOSH No 119806
BUILDING PERMIT - APPLICATION AND RECORD
Owner THOMAS R1L1NDA A WALSH Create Date 06/02/2006
Designer
Contractor
LEACH BROS.
Category
141 - Exterior Remodeling
Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq.Ft. Rooms Height Ft.
Finished/Living Sq.Ft. Bedrooms Stories
Garage Sq.Ft. Baths
Foundation . Poured Concrete 0 Floating Slab o Pier o Other
o Concrete Block o Post o Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
---~ --
D Projection I
Canopies
Signs
Use/Nature SFRllnstalling an egress window in the basement to accommodate a future bedroom. Any future work to finish the basement shall
of Work require additional permits.
j
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
~
$2,500.00
Plan Approval
$0.00 Permit Fee Paid
$32.00 Park Dedication
$0.00
Issued By:
Date 06/02/2006
FinaIlO.P. 00/00/0000
D Permit Voided I
Parcelld # 1342502100
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secu~e!any necessary approvals before starting such activity. ~
Signature,L. i- c_ .....__ ""'v;:.:_ Date -\~ {;;'/06
AgenUOwner
Address 2883 RUSCHFIELD DR
Oshkosh
WI 54904 - 0000 Telephone Number 420-5005
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.