HomeMy WebLinkAbout0119848-Plumbing (sump pump)
G
OSHKOSH
ON THE WATER
Job Address 2791 W 9TH AVE
PLUMBING PERMIT - APPLICATION AND RECORD
CITY OF OSHKOSH No 119848
Owner ROY E/BERNICE B SCHREIBER Create Date 06/02/2006
Plan
Contractor SAMMONS PLUMBING
Category 410 - Residential-Interior
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Water Softner Wait. St. Shamp Sink
Local Waste Ice Chest FlrlWst Sink
Clothes Wshr Exam Sink Catch Basin
Bidet Sculry Sink Wash Ftn
Beer Tap Hand Sink Urinal
Lab Sink Plaster Sink Standp Rec
Sterilizer Surgeons Sink Ice Maker
Dip Well F Prep Sink Gar Drain
Drink Ftn Serv Sink Soda Disp
Use/Nature FR / SUMP PUMP
of Work
Valuation
Issued By
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Sanitary Sewer
Storm Sewer
Water Service
Size
Material
Type
#
Conn. Type
Parcel Id #
1311971200
$350.00 Plan Approval
n~
$0.00
$20.00 0 Permit Voided I
Date 06/0212006
Permit Fees
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Agent/Owner
OSHKOSH
WI 54901 - 2298 Telephone Number 231-9880
Address 522 W. MURDOCK AVE
Date
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.