Loading...
HomeMy WebLinkAbout0119848-Plumbing (sump pump) G OSHKOSH ON THE WATER Job Address 2791 W 9TH AVE PLUMBING PERMIT - APPLICATION AND RECORD CITY OF OSHKOSH No 119848 Owner ROY E/BERNICE B SCHREIBER Create Date 06/02/2006 Plan Contractor SAMMONS PLUMBING Category 410 - Residential-Interior Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Water Softner Wait. St. Shamp Sink Local Waste Ice Chest FlrlWst Sink Clothes Wshr Exam Sink Catch Basin Bidet Sculry Sink Wash Ftn Beer Tap Hand Sink Urinal Lab Sink Plaster Sink Standp Rec Sterilizer Surgeons Sink Ice Maker Dip Well F Prep Sink Gar Drain Drink Ftn Serv Sink Soda Disp Use/Nature FR / SUMP PUMP of Work Valuation Issued By Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Sanitary Sewer Storm Sewer Water Service Size Material Type # Conn. Type Parcel Id # 1311971200 $350.00 Plan Approval n~ $0.00 $20.00 0 Permit Voided I Date 06/0212006 Permit Fees In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Agent/Owner OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 Address 522 W. MURDOCK AVE Date To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.