Loading...
HomeMy WebLinkAbout0119809-Plumbing (lateral) cD OSHKOSH ON THE WATER Job Address 340 W 11TH AVE CITY OF OSHKOSH No 119809 PLUMBING PERMIT - APPLICATION AND RECORD Owner GENE A TANK Create Date 06/0212006 Plan Contractor O'NEILL ENTERPRISE INC Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Category 401 - Residential-Exterior (laterals) Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs ~ANITARY AND WATER LATERAL RELAY, -.DEBIT ACCT ~ - ~- Size Material Type # Conn. Type Sanitary Sewer 4" Plastic Lateral 1 Relay Storm Sewer Water Service 1" Plastic Lateral 1 Relay Parcel Id # 0903570000 Valuation Issued By Shower Water Softner Wait. St. Shamp Sink Floor Drain Local Waste Ice Chest FlrlWst Sink Lndry Tray Clothes Wshr Exam Sink Catch Basin Disposal Bidet Sculry Sink Wash Ftn Dishwasher Beer Tap Hand Sink Urinal Sump Pump Lab Sink Plaster Sink Standp Rec Classrm Sink Sterilizer Surgeons Sink Ice Maker Breakrm Sink Dip Well F Prep Sink Gar Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp $5,000.00 $0.00 $100.00 0 Permit Voided I Date 06/0212006 Plan Approval Permit Fees In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Address 522 W 6TH AVE Agent/Owner OSHKOSH WI 54902 - 0000 Telephone Number 920-230-2007 Date To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (I.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.