Loading...
HomeMy WebLinkAbout0119802-Plumbing (water heater) e OSHKOSH ON THE WATER Job Address 1056TYLERAVE CITY OF OSHKOSH No 119802 PLUMBING PERMIT - APPLICATION AND RECORD Contractor J RASMUSSEN PLUMBING INC Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater 1 Site Drain Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Roof Drain Misc. Fixtures Water Sollner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn r"'~~ ~WA>ffi ""'" Size Use/Nature of Work OWner GLEN L DURRANT Create Date 06101/2006 Category 411 - Residential-Water Heaters Plan Wait St. Shamp Sink - Coffee Maker Ice Chest FlrlWst Sink Int Grease Trap Exam Sink Catch Basin - Ext Grease Trap - Sculry Sink Wash Ftn RPZ Valve Hand Sink Urinal Eye Wash Statn Plaster Sink Standp Rec Wtr Sewer Mtrs Surgeons Sink Ice Maker Deduct Meters F Prep Sink Gar Drain Wtr Usage Mtrs Serv Sink Soda Disp Sanitary Sewer Storm Sewer Water Service Material # Conn. Type Type Parcelld # 1607500000 Valuation Issued By $500.00 ~£¿) Plan Approval $0.00 Permit Fees $20.00 D PennitVoided I Date 06/01/2006 In the performance of this work. I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonn the work described in this permit application within an easement, the City strongly urges the pennit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Telephone Number 920-233-6747 Address 1914 GREENBRIAR TRL AgenUOwner OSHKOSH WI 54904 - 0000 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.