HomeMy WebLinkAbout0119802-Plumbing (water heater)
e
OSHKOSH
ON THE WATER
Job Address 1056TYLERAVE
CITY OF OSHKOSH
No
119802
PLUMBING PERMIT - APPLICATION AND RECORD
Contractor J RASMUSSEN PLUMBING INC
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater 1
Site Drain
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Roof Drain
Misc.
Fixtures
Water Sollner
Local Waste
Clothes Wshr
Bidet
Beer Tap
Lab Sink
Sterilizer
Dip Well
Drink Ftn
r"'~~ ~WA>ffi ""'"
Size
Use/Nature
of Work
OWner GLEN L DURRANT
Create Date 06101/2006
Category 411 - Residential-Water Heaters
Plan
Wait St. Shamp Sink - Coffee Maker
Ice Chest FlrlWst Sink Int Grease Trap
Exam Sink Catch Basin - Ext Grease Trap -
Sculry Sink Wash Ftn RPZ Valve
Hand Sink Urinal Eye Wash Statn
Plaster Sink Standp Rec Wtr Sewer Mtrs
Surgeons Sink Ice Maker Deduct Meters
F Prep Sink Gar Drain Wtr Usage Mtrs
Serv Sink Soda Disp
Sanitary Sewer
Storm Sewer
Water Service
Material
#
Conn. Type
Type
Parcelld #
1607500000
Valuation
Issued By
$500.00
~£¿)
Plan Approval
$0.00
Permit Fees
$20.00 D PennitVoided I
Date 06/01/2006
In the performance of this work. I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonn the work
described in this permit application within an easement, the City strongly urges the pennit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Telephone Number 920-233-6747
Address 1914 GREENBRIAR TRL
AgenUOwner
OSHKOSH
WI 54904 - 0000
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.