Loading...
HomeMy WebLinkAbout0119796 P e OSHKOSH pN THE WATER Job Address 1110 OREGON ST Contractor FIELDS PLUMBING CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner KING CLIFT PARTNERSHIP Category 411 - Residential-Water Heaters Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater 1 Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Valuation Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Water Softner Local Waste Clothes Wshr Wail.SI. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Shamp Sink ~ FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp No 119796 Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn I~ ~ wm,"~= Create Date 06/01/2006 Plan Coffee Maker Int Grease Trap Ext Grease Trap ~ RPZValve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Size Material Sanitary Sewer Storm Sewer Water.Service Type # Conn. Type Issued By $600.00 Parcelld # 0302820000 Plan Approval $0.00 Permit Fees $20.00 0 Permit Voided I Date 06/01/2006 In the performance of this work. I agree to perform all work pursuant to rules govemlng the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to sec~re any neces~~before starti.ng such activity. Signature C;; cff 7 Agent/OWner NEW LONDON Address 1939 SOUTHLAND LN WI 54961 - 0000 Telephone Number Date /' ;Ju-ve I - cJ >0 920-982-5813 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.