Loading...
HomeMy WebLinkAbout0119799-Plumbing (water closet) G OSHKOSH ON THE WATER Job Address 1844 MINERVA ST CITY OF OSHKOSH No 119799 PLUMBING PERMIT. APPLICATION AND RECORD OWner LINDAM SLAGER REV TRUST Create Date 05/31/2006 Contractor LC. PLUMBING INC. Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Cate90ry 410 - Residential-Interior Plan Shower Water Sollner Wait. 51. Shamp Sink Coffee Maker - Floor Drain Local Waste Ice Chest FlrlWst Sink Int Grease Trap Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap -- - 1 Disposal Bidet Sculry Sink Wash Ftn RPZ Valve Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Ejector/Grind Drink Ftn Serv Sink Soda Disp Use/Nature REPLACE OWNER SUPPLIED WATER CLOSET. ALSO SEE CORRECTION NOTICE DATED 5/7/06. of Work Valuation Issued By Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1213690000 $69.00 Plan Approval ZJn/ W $0.00 -.-- $20.00 0 Permit Voided i Permit Fees Date 06/01/2006 In the performance of this work. I agree to perform all work pursuant to rules govemlng the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Address N7012 ST RD 49 Date Agent/Owner FREEMONT WI 54940 - 0000 Telephone Number 1-920-867-5051 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.