Loading...
HomeMy WebLinkAbout0119793-Building (convert to sfr) e OSHKOSH ON THE WATER Job Address 117ENEWYORKAVE CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 119793 Owner KEVIN S BURCH Create Date 05/31/2006 Designer Contractor OWNER Category 256 - Parking Lots, Driveways Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size UnfinishecllBasement ~ Sq. Ft. Rooms Height Finished/Living ~ Sq. Ft. Bedrooms Stories Garage ~ Sq. Ft. Baths Ft. D Projection I Canopies Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Penmit Flood Plain Height Penmit Park Dedication #I Dwelling Units ~ #I Structures ~ Use/Nature SFRI Converting the existing duplex to a single family dwelling" and replacing the existing driveway. Any additional work will require of Work eperate permits. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $3,800.00 ptan Approval $0.00 Permit Fee Paid $38.00 Park Dedication $0.00 Issued By: ~ Date 05/31/2006 Final/O.P. 00/00/0000 D PennitVoided I Parcelld #I 1003620000 In the performance of this work I agree to perform all work pursuant to rules govemlng the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement .fa;. holder(s) and to secure any necess pprovals fore sing such activity. I:. Signature --1-, Date ;<,5¡ '1;; AgenUOwner Address 1110 MIDWAY RD 117 MENASHA WI 54952 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.