Loading...
HomeMy WebLinkAbout0119783-Plumbing (water heater) e OSHKOSH ON THE WATER Job Address 511 N MAIN ST CITY OF OSHKOSH No 119783 PLUMBING PERMIT - APPLICATION AND RECORD Owner KIN LLC Create Date 0513112006 Contractor KOCH PLUMBING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater 1 Site Drain Roof Drain Misc. Fixtures Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink EjectorlGrind Category 411 - Residential-Water Heaters Plan Water Softner Wait St. Shamp Sink Coffee Maker - Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap - Bidet Sculry Sink Wash Ftn RPZValve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink. Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp UselNature RENTAL-UPSTAIRS I REPLACE GAS WATER HEATER of Work Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 0700290000 Permit Fees $20.00 0 Permit Voided I Valuation $600.00 Issued By (JYYl ~ Plan Approval m____- $0.00 Date 0513112006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 2005 DOTY ST AgenUOwner OSHKOSH WI 54902 - 0000 Telephone Number 920-231-6661 or 235 To schedule inspections please call the Inspection Request line. at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified othervvise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.