Loading...
HomeMy WebLinkAbout0119789-Building (masonry) e OSHKOSH ON THE WATER Job Address 803 HARNEY AVE CITY OF OSHKOSH No 119789 BUILDING PERMIT - APPLICATION AND RECORD Owner SCOTT A EHNERT/SHANNON ZUMBRUNNE~ Create Date 05/31/2006 Designer Contractor OWNER Category 141 - Exterior Remodeling ptan Type . Building 0 Sign Q Canopy 0 Fence 0 Raze Zoning Class of Const: Size UnfinishediBasement ~ Sq. Ft. Rooms Height Finished/Living ~ Sq. Ft. Bedrooms Stories Garage ~ Sq. Ft. Baths Ft. 0 Projection I Canopies Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures 0 Use/Nature SFRI Installing stone and block on the front of the house. A footing has been installed 4' below grade to support the wall. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $150.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Issued By: ~ Date 05/31/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 0805300000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of OShk~ has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this pe~"1~~PPiication "thin an easemen the City strongly urges the permit applicant to contact the easement holder(s) and to ¥"'a<1¥.nece alYJ! ) Is b sta~[E'.".?h_~:ti~ity. Signature ~/" .---/ ./ Date -'C :). ;'/-06 Address 803 HARNEY AVE OSHKOSH WI 54901 - 5430 Telephone Number To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.