HomeMy WebLinkAbout0119775-Plumbing (water heater)
e
OSHKOSH
ON THE WATER
Job Address 806 ANCHORAGE CT
Contractor KOCH PLUMBING
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater 1
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
of Work
Valuation
Issued By
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
CITY OF OSHKOSH
No
119775
PLUMBING PERMIT - APPLICATION AND RECORD
Owner TK RESIDENTIAL INVESTMENTS LLC
Create Date 05/31/2006
Category 411 - Residential-Water Heaters
Plan
Water Softner Wai!.S!. Shamp Sink Coffee Maker
-
Local Waste Ice Chest FlrlWst Sink Int Grease Trap
Clothes Wshr Exam Sink Catch Basin Ex! Grease Trap -
Bidet Sculry Sink Wash Ftn RPZ Valve
Beer Tap Hand Sink Urinal Eye Wash Statn
Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
Sterilizer Surgeons Sink Ice Maker Deduct Meters
Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Drink Ftn Serv Sink Soda Disp
PARTMENT B / REPLACE GAS WATER HEATER
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
1519700000
$0.00
$20.00 0 Permit Voided I
$600.00
Plan Approval
Date 05/31/2006
Permit Fees
In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a panty, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 2005 DOTY ST
920-231-6661 or 235
Agent/Owner
OSHKOSH
WI 54902 - 0000
Telephone Number
To schedule inspec1ions please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.