Loading...
HomeMy WebLinkAbout0119792-Builidng (misc. exterior) ~ OSHKOSH ON THE WATER Job Address 129 W 17TH AVE CITY OF OSHKOSH No 119792 BUILDING PERMIT. APPLICATION AND RECORD OWner GAYLE M SAVKA Create Date 05/31/2006 Designer Contractor KEN'S SIDING Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement - Sq. Ft. Rooms Height Finished/Living - Sq.Ft. Bedrooms Stories Garage - Sq. Ft. Baths Ft. 0 Projection I Canopies Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Penmit Park Dedication # OWelling Units ----.!1 # Structures ----.!1 Use/Nature OMM/lnstalling new vinyl siding, re-roofing the front 1/2 of the older portion of the building (installation of asphalt shingles), and of Work installing two 'replacement windows and one new window. A code compliant header will be installed. This permit does not include any lectrical work. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: ~ $17,000.00 Plan Approval $0.00 Penmit Fee Paid $109.00 Park Dedication $0.00 Date 05/31/2006 Final/O,P. DO/DO/DODO 0 Permit Voided I Parcelld # 1400130000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary apR -et re starting such activity, Signature . AgenUOwner OSHKOSH Date ~/'D& ( WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.