HomeMy WebLinkAbout0119792-Builidng (misc. exterior)
~
OSHKOSH
ON THE WATER
Job Address 129 W 17TH AVE
CITY OF OSHKOSH
No
119792
BUILDING PERMIT. APPLICATION AND RECORD
OWner GAYLE M SAVKA
Create Date
05/31/2006
Designer
Contractor
KEN'S SIDING
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement - Sq. Ft. Rooms Height
Finished/Living - Sq.Ft. Bedrooms Stories
Garage - Sq. Ft. Baths
Ft.
0 Projection I
Canopies
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Penmit
Park Dedication
# OWelling Units ----.!1
# Structures
----.!1
Use/Nature OMM/lnstalling new vinyl siding, re-roofing the front 1/2 of the older portion of the building (installation of asphalt shingles), and
of Work installing two 'replacement windows and one new window. A code compliant header will be installed. This permit does not include any
lectrical work.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
Issued By: ~
$17,000.00 Plan Approval
$0.00 Penmit Fee Paid
$109.00 Park Dedication
$0.00
Date 05/31/2006
Final/O,P. DO/DO/DODO
0 Permit Voided I
Parcelld # 1400130000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary apR -et re starting such activity,
Signature .
AgenUOwner
OSHKOSH
Date ~/'D&
(
WI 54901 - 0000
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.