Loading...
HomeMy WebLinkAbout0119785-Building e OSHKOSH ON THE WATER Job Address 206-212W12THAVE CITY OF OSHKOSH No 119785 BUILDING PERMIT - APPLICATION AND RECORD Owner DALE M/SHERRY L HOTOVEC Create Date 05/31/2006 Designer Contractor GMC CONSTRUCTION INC Category 223 - Aiteration Offices, Banks, Professional Plan Type 8 Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size UnfinishediBasement - Sq. Ft. Rooms Height Finished/Living - Sq. Ft. Bedrooms Stories Garage - Sq.Ft. Baths Ft. D Projection I Canopies Signs Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 8°tl1er Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures ~ Use/Nature 08 W 12 Ave - Remedies -Interior alterations to expand tenant space by combining with westerly space (formerly 212.) Install partition of Work walls to create offices. storage room and sauna room. HVAC Contractor Plumbing Contractor Electric Contractor $0.00 Permit Fee Paid $84.00 Park Dedication $0.00 Fees: Valuation Issued By: Date 05/31/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 0901240000 In tI1e performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no autl1ority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit plication within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secu ne sary approvals before starting such activity. -~ J Signature Date :;;'7 t7b Agent/Owner LARSEN Wi 54947 - 8715 Telephone Number 920-836-1708 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.