HomeMy WebLinkAbout0119785-Building
e
OSHKOSH
ON THE WATER
Job Address 206-212W12THAVE
CITY OF OSHKOSH
No
119785
BUILDING PERMIT - APPLICATION AND RECORD
Owner DALE M/SHERRY L HOTOVEC
Create Date
05/31/2006
Designer
Contractor
GMC CONSTRUCTION INC
Category
223 - Aiteration Offices, Banks, Professional
Plan
Type
8 Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
UnfinishediBasement - Sq. Ft. Rooms Height
Finished/Living - Sq. Ft. Bedrooms Stories
Garage - Sq.Ft. Baths
Ft.
D Projection I
Canopies
Signs
Foundation
0 Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
8°tl1er
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
~
Use/Nature 08 W 12 Ave - Remedies -Interior alterations to expand tenant space by combining with westerly space (formerly 212.) Install partition
of Work walls to create offices. storage room and sauna room.
HVAC Contractor
Plumbing Contractor
Electric Contractor
$0.00 Permit Fee Paid
$84.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
Date 05/31/2006
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 0901240000
In tI1e performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no autl1ority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit plication within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secu ne sary approvals before starting such activity. -~ J
Signature Date :;;'7 t7b
Agent/Owner
LARSEN
Wi 54947 - 8715 Telephone Number
920-836-1708
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.