HomeMy WebLinkAbout2006-Plumbing (sink)
G
OSHKOSH
ON THE WATER
Job Address 555 S WASHBURN ST
Contractor TRADER PLUMBING
CITY OF OSHKOSH
PLUMBING PERMIT. APPLICATION AND RECORD
No
119746
OWner PR & PS ENTERPRISES
Create Date 03/17/2006
Category 440 - Industrial-Interior
Plan
Bathtub 0 Shower 0 Water softner 0 Wait.sl. 0 Shamp Sink 0 Coffee Maker 0
Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWstsink 0 Int Grease Trap 0
Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 2 Catch Basin 0 Ext Grease Trap ~
Toilet 0 Disposal 0 Bidet 0 sculry Sink 0 Wash Ftn 0 RPZ Valve 0
Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0 Eye Wash statn 0
Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 standp Rec 0 Wtr Sewer Mtrs 0
Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0
Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Wtr Usage MIrs 0
Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 serv Sink 0 Soda Disp 0
Misc. 0
Fixtures
Use/Nature
of Work
WORK ADDED TO PERMIT #118423.WORK HAS BEEN COMPLETED WITHOUT A PERMIT APPLICATION SUBMITTED BY
CONTRACTOR."DEBIT ACCT
Size
Material
Type
#
0
0
0
0
0
0
0
0
0
0
Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Valuation
$1.00
Plan Approval
$0.00
Permit Fees
0
0
0
0
0
$20.00 0 Permit Voided I
Parcelld #
0614610000
Issued By
Date 05/30/2006
In the performance of this work. I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which It is not a party. if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 500 APPLETON ST
Agent/Owner
MENASHA
WI 54952 - 0000
Telephone Number 920-858-4360 BRiAr
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.