Loading...
HomeMy WebLinkAbout2006-Electric ~ OSHKOSH ON THE WATER Job Address 4045PRAIRIELN CITY OF OSHKOSH No 119724 ELECTRIC PERMIT -APPLICATION AND RECORD OWner RUSSELL LITAMMI FROST Create Date 05/0212006 Contractor HOMEOWNER Category 612. Residential-Single Family Addition/R Plan Service 0 New 0 Change 0 Temp 8N/A Type 0 Overhead Circuits 2 Switches 3 0 Underground Volts Luminaires 3 Amps Receptacles 55 Appliances Use/Nature of FRI neceesary wiring for remodeling the basement to include a rec room, work room. and computer room. Combustion air will be Work required for the confined utility area. The basement is not to be used for bedrooms. Issued By: 4rk $500.00 Plan Approval $0.00 Permit Fee Paid $20.00 Fees: Valuation Date 5/26/2006 0 Permit Voided I Parcelld# 1528420000 The undersigned, in applying for an Electric Penmit to perfonm electrical work within a single family home, owned and occupied as the principle residence by the undersigned, hereby acknowledges per City Municipal Code Section 11-22, that other individuals may not be employed to assist with the work described in this penmit unless said individuals are licensed by the City of Oshkosh to perform said work. in the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement holder(s) and ~o cure any necess,aryaBJT:al~_be~ starting such activity. 5:.2t1 -0 ÉA Signature .~"' l.Ý?-tf)/' Date '-(' Agent/Owner Address OSHKOSH WI 5490 - 0000 Telephone Number 426-8257 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.