HomeMy WebLinkAbout0119736-Building (garage/driveway)
'\D'
OSHKOSH
ON THE WATER
Job Address 800 POWERS ST
CITY OF OSHKOSH
No
119736
BUILDING PERMIT - APPLICATION AND RECORD
Owner CHARLES 0 OSWALD
Create Date
OS/26/2006
Designer
Contractor
OWNER
Category
149 - Raze detached garage. construct detached garage
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement - Sq. Ft. Rooms Height
Finished/Living Sq. Ft. Bedrooms Stories
-
Garage - Sq. Ft. Baths
Ft.
D Projection I
Canopies
Signs
Foundation
. Poured Concrete 0 Fioating Siab
0 Concrete Biock 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
--
# Dwelling Units 0
# Structures
0
Park Dedication
Use/Nature
of Work
FRI 24' x 30' Detached Garage' in the rear yard, the eJdsitng driveway may be paved with the garage slab.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
Issued By: 'fj
$5.000.00 Plan Approval -~ Permit Fee Paid
$44.00 Park Dedication
$0.00
Date OS/26/2006
FinaVO.P. 00/00/0000
D Permit Voided I
Parcelld # 1106910000
In the performance of this work I agree to perfonn all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this pe!l)1(t application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and toßécure a necessary approval efo rting such activi
.' . / ,
Signature .y'-. /
Address '8ob POWERS ST
Date X S-,;¿ {, -Ò{;
.
OSHKOSH
WI 54901 - 0000
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
.,;
.\;~\., r,Æ'?A ..
Z1 Xo 30'