Loading...
HomeMy WebLinkAbout0119738-Plumbing ~ OSHKOSH ON THE WATER Job Address 1185HEIOIHAVENOR CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD 119738 OWner RUSCH HOMES LLC Contractor SBS PLUMBING LLC Category 410 - Residential-Interior No Create Date 05/19/2006 Bathtub 3 Shower Whirlpool Floor Drain Lavatory 3 Lndry Tray Toilet 3 Disposal Res. Sink 1 Dishwasher Bar Sink Sump Pump Water Heater 1 Classrm Sink Site Drain Breakrm Sink Roof Drain Ejector/Grind 2 hose bibb Misc. Fixtures Use/Nature ofWork Valuation Issued By WaterSoftner Wait.St. 1 Local Waste Ice Chest Clothes Wshr 1 Exam Sink 1 Bidet Sculry Sink 1 BeerTap Hand Sink 1 Lab Sink Plaster Sink Sterilizer Surgeons Sink Dip Well F Prep Sink Drink Ftn Serv Sink Plan Shamp Sink - FlrlWstSink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap - RPZ Valve Eye Wash Statn 2 Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs NSFR/1 story home with a 2 car attached garage, 14'x14' patio.Gas water heater "debit acct Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1342953300 $6,050.00 Plan Approval $0.00 Permit Fees $140.00 0 Permit Voided I Date OS/26/2006 In the performance of this work, I agree to perform ali work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it Is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address PO BOX 3904 Telephone Number 920-410-5933 AgenUOWner OSHKOSH WI 54903 - 3904 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.