HomeMy WebLinkAbout0119739-Plumbing
e
OSHKOSH
ON THE WATER
Job Address 1160 HEIDI HAVEN DR
CITY OF OSHKOSH
No
119739
PLUMBING PERMIT - APPLICATION AND RECORD
Owner RUSCH HOMES LLC
Contractor SBS PLUMBiNG LLC
Category 410 - Residential-Interior
Create Date 05/19/2006
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater 1
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
ofWork
Valuation
Issued By
2 Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
2 HOSE BiBB
2
2
1
Water Softner
1 Local Waste
Clothes Wshr
Wail.SI.
Ice Chest
1 Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
Plan
Shamp Sink ~
FlrlWst Sink
Catch Basin
Wash Ftn
Urinal
Standp Rec
Ice Maker
Gar Drain
Coffee Maker
Int Grease Trap
Ext Grease Trap ~
RPZ Valve
Eye Wash Statn
2 Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
1 Bidet
1 BeerTap
1 Lab Sink
Sterilizer
Dip Well
Drink Ftn
$0.00
Permit Fees
Soda Disp
NSFR/1 story home with a two car attached garage, 13'6"x14' patio.Gas water heater. "debit acet
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
1342955000
$119.00 D Permit Voided I
Date OS/26/2006
$4,200.00
Plan Approval
in the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement haider(s) and to secure any necessary appravais before starting such activity.
Signature
Date
Address PO BOX 3904
Telephone Number 920-410-5933
Agent/Owner
OSHKOSH
Wi 54903 - 3904
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.