Loading...
HomeMy WebLinkAbout0119725-Plumbing (water heater) e OSHKOSH ON THE WATER Job Address 2002 EVANS ST CITY OF OSHKOSH No 119725 PLUMBING PERMIT. APPLICATION AND RECORD OWner CHARLES AIMARIL YN J PERRY Create Date OS/26/2006 Contractor KOCH PLUMBING Bathtub Whirlpool Lavatory Toilet Res, Sink Bar Sink Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Water Heater 1 Site Drain Roof Drain Misc. Fixtures Cate90ry 411 - Residential-Water Heaters Plan Water Softner Wait.St, Shamp Sink - Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ex! Grease Trap - Bidet Sculry Sink Wash Ftn RPZValve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp UselNature <REPLACE GAS WATER HEATER UNIT #1"DEBIT ACCT of Work Sanitary Sewer Conn. Type Storm Sewer Water Service Size Material Type # Parcelld # 1514819706 Valuation $600,00 Plan Approval Issued By $0,00 $20,00 0 Permit Voided I Permit Fees Date OS/26/2006 In the performance of this work. I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement. the City strongiy urges the permit appiicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity, Signature Date Address 2005 DOTY ST 920-231-6661 or 235 Agent/Owner OSHKOSH WI 54902 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.