Loading...
HomeMy WebLinkAbout0119731-Plumbing (water heater) e OSHKOSH ON THE WATER Job Address 103 BROCKWAY AVE CITY OF OSHKOSH No 119731 Contractor MOREMAN PLUMBING PLUMBING PERMIT. APPLICATION AND RECORD Owner RALPH W HOEFT Create Date OS/26/2006 Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater 1 Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Valuation Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Category 411 - Residential-Water Heaters Plan $800.00 Plan Approval WaterSoftner Wait.St. Shamp Sink Coffee Maker - Local Waste Ice Chest FlrlWstSink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap - - Bidet Sculry Sink Wash Ftn RPZValve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp REPLACE GAS WATER HEATER "DEBIT ACCT Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1401620000 Issued By $0.00 $20.00 0 Permit Voided I Permit Fees Date OS/26/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address PO BOX 1325 Agent/Owner OSHKOSH WI 54903 - 0000 Telephone Number 231-9191 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.