HomeMy WebLinkAbout0119726-Plumbing (water heater)
e
OSHKOSH
ON THE WATER
Job Address 1301 W BENT AVE
CITY OF OSHKOSH
No
119726
PLUMBING PERMIT - APPLICATION AND RECORD
Owner JACQUELINE S WINKELMAN
Create Date OS/26/2006
Contractor KOCH PLUMBING
Category 411 - Residential-Water Heaters
Plan
Bathtub Shower Watersotlner Wait St. Shamp Sink - Coffee Maker
Whirlpool Floor Drain Local Waste Ice Chest Flr/Wst Sink Int Grease Trap
Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap -
Toilet Disposal Bidet sculry Sink Wash Ftn RPZValve
Res. Sink Dishwasher Beer Tap Hand Sink Urinal Eye Wash statn
Bar Sink Sump Pump Lab Sink Piaster Sink standp Rec Wtr Sewer Mtrs
Water Heater 1 Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters
Site Drain Breaknm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Roof Drain Ejector/Grind Drink Ftn serv Sink Soda Disp
Misc.
Fixtures
Use/Nature
ofWork
REPLACE GAS WATER HEATER "DEBIT ACCT
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcel Id #
1202430000
Valuation
$600.00
Plan Approval
$0.00
Permit Fees
$20.00 0 Permit Voided I
Issued By
Date OS/26/2006
In the performance of this work, I agree to perform all work pursuant to rules govemlng the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 2005 DOTY ST
Agent/OWner
OSHKOSH
WI 54902 - 0000
Telephone Number 920-231-6661 or 235
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.