HomeMy WebLinkAbout0119708-Building (roof)
~
OSHKOSH
ON THE WATER
Job Address 2017 SHERIDAN ST
CITY OF OSHKOSH
No
119708
BUILDING PERMIT. APPLICATION AND RECORD
Owner SCOTT J/APRIL L PAULSEN
Create Date
OS/25/2006
Designer
Contractor
HICKEY ROOFING
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
Class of Const:
Q Fence
0 Raze
Zoning
Size
UnfinishediBasement
- Sq. Ft.
_Sq.Ft.
Rooms
Height
Ft.
D Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
- Sq. Ft.
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units ~
# Structures
~
Use/Nature ßFRI Tear-off and repiace roofing on upper area of house roof oniy. . No structural work
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
$1,680.00 Plan Approval
$0.00 Permit Fee Paid
$26.00 Park Dedication
Fees: Valuation
$0.00
Issued By:
Date 05/25/2006
Final/O.P. 0010010000
D Permit Voided I
Parcelld # 1215430000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
1427 BROAD ST
Agenl/Owner
OSHKOSH
WI 54901 - 0000
Telephone Number
426-4008
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, We will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.