HomeMy WebLinkAbout2006-Plumbing (city rehab)
~
OSHKOSH
ON THE WATER
Job Address 1422 RUSH AVE
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Contractor J RASMUSSEN PLUMBING INC
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Shower
Floor Drain
Lndry Tray
1 Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
1 hose bibb
Water Softner
Local Waste
Clothes Wshr
Bidet
Beer Tap
Lab Sink
Sterilizer
Dip Well
Drink Ftn
Owner BONNIE M JUREK
Category 410 - Residential-Interior
Wail.SI.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
Shamp Sink ~
FlrlWstSink
Catch Basin
Wash Ftn
Urinal
Standp Rec
Ice Maker
Gar Drain
Soda Disp
No
119700
Create Date OS/24/2006
Plan
Coffee Maker
Int Grease Trap
Ext Grease Trap ~
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
ity rehab project. repiace outside silsock. automatic clothes washer standpipe and repiace water closet. ..debit acct
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
1609460000
Use/Nature
of Work
Valuation
Issued By
$1,000.00
Plan Approval
$0.00
Permit Fees
$21.00 D Permit Voided I
Date 05125/2006
In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit appiication within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Telephone Number 920-233-6747
Address
1914 GREENBRiAR TRL
AgenUOwner
OSHKOSH
WI 54904 - 0000
Date
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.