Loading...
HomeMy WebLinkAbout2006-Plumbing (city rehab) ~ OSHKOSH ON THE WATER Job Address 1422 RUSH AVE CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Contractor J RASMUSSEN PLUMBING INC Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Shower Floor Drain Lndry Tray 1 Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind 1 hose bibb Water Softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn Owner BONNIE M JUREK Category 410 - Residential-Interior Wail.SI. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Shamp Sink ~ FlrlWstSink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp No 119700 Create Date OS/24/2006 Plan Coffee Maker Int Grease Trap Ext Grease Trap ~ RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs ity rehab project. repiace outside silsock. automatic clothes washer standpipe and repiace water closet. ..debit acct Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1609460000 Use/Nature of Work Valuation Issued By $1,000.00 Plan Approval $0.00 Permit Fees $21.00 D Permit Voided I Date 05125/2006 In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit appiication within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Telephone Number 920-233-6747 Address 1914 GREENBRiAR TRL AgenUOwner OSHKOSH WI 54904 - 0000 Date To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.