HomeMy WebLinkAbout0119716-Plumbing (laterals)
0
OSHKOSH
ON THE WATER
Job Address 10 W MURDOCK AVE
CITY OF OSHKOSH
No
119716
PLUMBING PERMIT - APPLICATION AND RECORD
Owner ASSOCIATED BANC CORP
Create Date OS/25/2006
Contractor 4 WAY CONSTRUCTION
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
. Breakrm Sink
Ejector/Grind
Category 430 - Industrial-Exterior (laterals)
Plan
Water Softner Wait.St. Shamp Sink - Coffee Maker
Local Waste Ice Chest Flr/Wst Sink Int Grease Trap
Clothes Wshr Exam Sink Catch Basin 7 Ext Grease Trap
-
Bidet Sculry Sink Wash Ftn RPZ Valve
Beer Tap Hand Sink Urinal Eye Wash Statn
Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
Sterilizer Surgeons Sink Ice Maker Deduct Meters
Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Drink Ftn Serv Sink Soda Disp
STORM LATERAL AND SITE DRAINAGE FOR NEW ASSOCIATED BANK."CHECK 32938
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer 8" Plastic Lateral 1 New
Water Service
Parcelld #
1514970500
Use/Nature
ofWork
Valuation
Issued By
$35,000.00
Plan Approval
$0.00
$99.00 0 Permit Voided I
Permit Fees
Date OS/25/2006
In the performance of this work, I agree to perfonm all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work
described in this penmit application within an easement, the City strongly urges the penmit applicant to contact the
easement holder(s) and to secure any ne sary provals before starting such activity.
Signature
AgenUOWner
BERLIN
Date '-:>/~f¡"{.
/ /
Telephone Number 920-361-1403
WI 54923 - 0133
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.