Loading...
HomeMy WebLinkAbout0119716-Plumbing (laterals) 0 OSHKOSH ON THE WATER Job Address 10 W MURDOCK AVE CITY OF OSHKOSH No 119716 PLUMBING PERMIT - APPLICATION AND RECORD Owner ASSOCIATED BANC CORP Create Date OS/25/2006 Contractor 4 WAY CONSTRUCTION Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink . Breakrm Sink Ejector/Grind Category 430 - Industrial-Exterior (laterals) Plan Water Softner Wait.St. Shamp Sink - Coffee Maker Local Waste Ice Chest Flr/Wst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin 7 Ext Grease Trap - Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp STORM LATERAL AND SITE DRAINAGE FOR NEW ASSOCIATED BANK."CHECK 32938 Size Material Type # Conn. Type Sanitary Sewer Storm Sewer 8" Plastic Lateral 1 New Water Service Parcelld # 1514970500 Use/Nature ofWork Valuation Issued By $35,000.00 Plan Approval $0.00 $99.00 0 Permit Voided I Permit Fees Date OS/25/2006 In the performance of this work, I agree to perfonm all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work described in this penmit application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and to secure any ne sary provals before starting such activity. Signature AgenUOWner BERLIN Date '-:>/~f¡"{. / / Telephone Number 920-361-1403 WI 54923 - 0133 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.