Loading...
HomeMy WebLinkAbout0119701-Electric (service change) e OSHKOSH ON THE WATER Job Address 1948 MICHIGAN ST CITY OF OSHKOSH No 119701 ELECTRIC PERMIT -APPLICATION AND RECORD Owner TERRY GRUNWALD ETAL Create Date OS/25/2006 Contractor HOMEOWNER Category 634 - Residential-$ervice Change Plan Service 0 New 120/240 . Change 0 Temp ON/A Type . Overhead 0 Underground Volts Amps 100 Circuits Switches Luminaires Receptacles Appliances Use/Nature of ~FR\ Service change--refeed existing panel with 2" Rigid mast. Update grounding as necessary and install according to current code. Work ~wner to install service. Greg Davis to install conductors. Fees: Valuation $500.00 Plan Approval $0.00 Permit Fee Paid $20.00 Issued By: fl~ Date 5/25/2006 n Permit Voided I Parcelld # 1409860000 The undersigned, in applying for an Electric Permit to perform electrical work within a single family home, owned and occupied as the principle residence by the undersigned, hereby acknowledges per City Municipal Code Section 11-22, that other individuals may not be employed to assist with the work described in this permit unless said individuals are licensed by the City of Oshkosh to perform said work. In the performance of this work I agree to perform all work pursuant to ruies goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement. the City strongiy urges the permit applicant to contact the easement hoider(s) and to secure any necessary approvals before starting such activity. Signature ~C!!. ~ Date S Þ ~/ ct:. Address TERRY GRUNWALD ETAL AgenUOwner OSHKOSH WI 5490 - 6837 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 notin9 the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.