HomeMy WebLinkAbout0119701-Electric (service change)
e
OSHKOSH
ON THE WATER
Job Address 1948 MICHIGAN ST
CITY OF OSHKOSH
No
119701
ELECTRIC PERMIT -APPLICATION AND RECORD
Owner
TERRY GRUNWALD ETAL
Create Date OS/25/2006
Contractor
HOMEOWNER
Category 634 - Residential-$ervice Change
Plan
Service
0 New
120/240
. Change
0 Temp
ON/A
Type
. Overhead
0 Underground
Volts
Amps
100
Circuits
Switches
Luminaires
Receptacles
Appliances
Use/Nature of ~FR\ Service change--refeed existing panel with 2" Rigid mast. Update grounding as necessary and install according to current code.
Work ~wner to install service. Greg Davis to install conductors.
Fees: Valuation
$500.00
Plan Approval
$0.00
Permit Fee Paid
$20.00
Issued By:
fl~
Date 5/25/2006
n Permit Voided I
Parcelld # 1409860000
The undersigned, in applying for an Electric Permit to perform electrical work within a single family home, owned and occupied
as the principle residence by the undersigned, hereby acknowledges per City Municipal Code Section 11-22, that other
individuals may not be employed to assist with the work described in this permit unless said individuals are licensed by the
City of Oshkosh to perform said work.
In the performance of this work I agree to perform all work pursuant to ruies goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement. the City strongiy urges the permit applicant to contact the easement
hoider(s) and to secure any necessary approvals before starting such activity.
Signature ~C!!. ~
Date S Þ ~/ ct:.
Address
TERRY GRUNWALD ETAL
AgenUOwner
OSHKOSH
WI 5490 - 6837
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 notin9 the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.