HomeMy WebLinkAbout0119721 P
e
OSHKOSH
ON THE WATER
Job Address 571 N MAIN ST
CITY OF OSHKOSH
No
119721
PLUMBING PERMIT - APPLICATION AND RECORD
Contractor D.R. HANSEN PLBG.
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
1 Classrm Sink
Breakrm Sink
Ejector/Grind
Water Softner
Local Waste
Clothes Wshr
Bidet
1 BeerTap
Lab Sink
Sterilizer
Dip Well
Drink Ftn
OWner JRD INVESTMENTS LLC
Create Date OS/25/2006
Plan
Category 440 - Industrial-Interior
Wail.SI.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Shamp Sink ~ Coffee Maker
FlrlWst Sink 2 Int Grease Trap
Catch Basin Ext Grease Trap ~
Wash Ftn RPZValve
Urinal Eye Wash Statn
Standp Rec Wtr Sewer Mtrs
Ice Maker 1 Deduct Meters
Gar Drain Wtr Usage Mtrs
Soda Disp
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
Work Installing bar area of remodie. "(Debit Account)
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
0700460000
Use/Nature
ofWork
Valuation
Issued By
$5,000.00
Plan Approval
$0.00
Permit Fees
$42.00 0 Permit Voided I
Date OS/25/2006
In the perfonnance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this penni! application within an easement, the City stron91y urges the pennit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 55 KNAPP ST
Agent/Owner
OSHKOSH
WI 54902 - 0000
Telephone Number 233-1595
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.