Loading...
HomeMy WebLinkAbout2006-Plumbing (catch basin) e OSHKOSH ON THE WATER Job Address 2920 N MAIN ST CITY OF OSHKOSH No 119715 PLUMBING PERMIT - APPLICATION AND RECORD OWner FONDA GROUP INC Create Date 05/25/2006 Cate90ry 431 - Industrial-Exterior (other) Contractor MR ROOTER OF THE FOX VALLEY Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. FiJdures Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Plan Water Softner Local Waste Clothes Wshr Wait.St. Shamp Sink - Coffee Maker Ice Chest FlrlWstSink Int Grease Trap Exam Sink Catch Basin 2 Ext Grease Trap - Sculry Sink Wash Ftn RPZValve Hand Sink Urinal Eye Wash Statn Plaster Sink Standp Rec Wtr Sewer Mtrs Surgeons Sink Ice Maker Deduct Meters F Prep Sink Gar Drain Wtr Usage Mtrs Serv Sink Soda Disp Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn REPLACE EXISTING CATCH BASINS NEAR LOADING DOCKS FACING MAIN ST "DEBIT ACCT Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1519600600 Use/Nature ofWork Valuation Issued By $4,000.00 $0.00 $20.00 0 Permit Voided I Plan Approval Date 05/25/2006 Address PO BOX 3063 Permit Fees In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit appiication within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner APPLETON WI 54914 - 0000 Telephone Number 920-687-9178 To schedule inspections please cali the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.