HomeMy WebLinkAbout2006-Plumbing (catch basin)
e
OSHKOSH
ON THE WATER
Job Address 2920 N MAIN ST
CITY OF OSHKOSH
No
119715
PLUMBING PERMIT - APPLICATION AND RECORD
OWner FONDA GROUP INC
Create Date 05/25/2006
Cate90ry 431 - Industrial-Exterior (other)
Contractor MR ROOTER OF THE FOX VALLEY
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
FiJdures
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Plan
Water Softner
Local Waste
Clothes Wshr
Wait.St. Shamp Sink - Coffee Maker
Ice Chest FlrlWstSink Int Grease Trap
Exam Sink Catch Basin 2 Ext Grease Trap -
Sculry Sink Wash Ftn RPZValve
Hand Sink Urinal Eye Wash Statn
Plaster Sink Standp Rec Wtr Sewer Mtrs
Surgeons Sink Ice Maker Deduct Meters
F Prep Sink Gar Drain Wtr Usage Mtrs
Serv Sink Soda Disp
Bidet
Beer Tap
Lab Sink
Sterilizer
Dip Well
Drink Ftn
REPLACE EXISTING CATCH BASINS NEAR LOADING DOCKS FACING MAIN ST "DEBIT ACCT
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
1519600600
Use/Nature
ofWork
Valuation
Issued By
$4,000.00
$0.00
$20.00 0 Permit Voided I
Plan Approval
Date 05/25/2006
Address PO BOX 3063
Permit Fees
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit appiication within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Agent/Owner
APPLETON
WI 54914 - 0000
Telephone Number 920-687-9178
To schedule inspections please cali the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.