Loading...
HomeMy WebLinkAbout0119709-Building (roof) e OSHKOSH ON THE WATER Job Address 417 HAWK ST CITY OF OSHKOSH No 119709 BUILDING PERMIT - APPLICATION AND RECORD Owner JOHN/KATHLEEN RADERMACHER Create Date OS/25/2006 Designer Contractor RB ROOFING & SIDING Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Canst: Size Unfinished/Basement ~ Sq. Ft. Rooms Height Finished/Living ~ Sq. Ft. Bedrooms Stories Garage ~ Sq. Ft. Baths Ft. 0 Projecton I Canopies Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit # Dwelling Units 0 # Structures 0 Park Dedication Use/Nature SFR / TEAR OFF & REPLACE EXISTING ROOFiNG ON HOUSE AND GARAGE NO STRUCTURAL CHANGES of Work Plumbing Contractor HVAC Contractor Electric Contractor $5.000.00 Plan Approval $0.00 Permit Fee Paid $50.00 Park Dedication $0.00 Fees: Valuation Issued By: 4? N'J Date OS/25/2006 Final/D.P. 00/00/0000 0 Permit Voided I Parcelld # 1609290000 In the performance of this work I agree to perform all work pursuant to ruies governing the described constructon. While the City of Oshkosh has no authority to enforce easement restrictons of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to see ny necessary approvais before starting su activity. Signature Date .Ç~;2. >-Oç; Address 741 W 17TH AVE OSHKOSH WI 54902 - 0000 Telephone Number 426-2073 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.