Loading...
HomeMy WebLinkAbout0119713-Building (roof) e OSHKOSH ON THE WATER Job Address 2407 HARRISON ST CITY OF OSHKOSH No 119713 BUILDING PERMIT - APPLICATION AND RECORD Owner JEANIE A KLINKER Create Date OS/25/2006 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement - Sq. Ft. Rooms Height Finished/Living - Sq. Ft. Bedrooms Stories Garage - Sq. Ft. Baths Ft. ( 0 Projection I Canopies Signs Foundation . Poured Concrete 0 Fioating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures ~ Use/Nature SFR / Tear off and replace existing roofing on house. . No structural work being done. ofWork HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: ~ $3,000.00 Plan Approval -_!Q:!JQ Permit Fee Paid $32.00 Park Dedication $0.00 Date OS/25/2006 Final/O.P. 00/00/0000 0 PermitVo~ Parcelld # 1519600205 in the performance of this work i agree to perform all work pursuant toruies governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals befor starting such activity. , Date 0<;; -:) <; - G C, Signature Address 2407 HARRISON ST AgenVOWner OSHKOSH WI 54901 - 1603 Telephone Number -- To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we wi,lI assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.