Loading...
HomeMy WebLinkAbout0119699-Building (driveway) ~ OSHKOSH ON THE WATER Job Address 1640 CHATHAM DR CITY OF OSHKOSH No 119699 BUILDING PERMIT. APPLICATION AND RECORD Owner MICHAEUPAMELA ISAKSSON Create Date OS/25/2006 Desi9ner Contractor Bill'S CONSTRUCTION Cate90ry 256 - Parking lots, Driveways Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement - Sq. Ft. Rooms Height Finished/Living - Sq. Ft. Bedrooms Stories Garage - Sq. Ft. Baths Ft. D Projection I Canopies Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures ~ Use/Nature of Work FRI Replacing a driveway' The existing concrete driveway will be replaced. No expansion is proposed or approved with this permit. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1,800.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Issued By: Date OS/25/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcel Id # 1318350000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described In this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any n ssary appr s be re starting such activity. . {r; / Signature ~ Date ><::: ~~-~ Agent/Owner OSHKOSH WI 54901 - 0000 Telephone Number 920-303-1160 Address 1331 EVANS ST To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.