Loading...
HomeMy WebLinkAbout0119720-Building (windows) e OSHKOSH ON THE WATER Job Address 603CEAPEAVE CITY OF OSHKOSH No 119720 BUILDING PERMIT - APPLICATION AND RECORD Owner BREFCYNSKIINVESTMENTS LLC Create Date OS/25/2006 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement - Sq. Ft. Rooms Height FinishedlLiving - sq.Ft. Bedrooms Stories Garage - Sq. Ft. Baths Ft. 0 Projection I Canopies Signs Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood . Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature RES/ Replace 6 windows, same size and style (doubie hung.) Wrap casings and sills. of Work HVAC Contractor Plumbin9 Contractor Fees: Valuati 1,300.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Issued By: Date OS/25/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 0801110000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an ease ent, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any nee sary ap v efore starting suCh activity. Date 5'- 2..s--0 h Ci"',;, _3.79-?'>/G WI 54904 -9369 Telephone Number 7Gv-~ Agent/Owner OSHKOSH Address 3438 CHARLIE ANNA DR To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.