Loading...
HomeMy WebLinkAbout0119705-Building (windows) e OSHKOSH ON THE WATER Job Address 1732 ASHLAND ST CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 119705 Owner TIMOTHY D/SHARON K SIX SR Create Date OS/25/2006 Designer Contractor WINDOW WORLD OF MILWAUKEE Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement _Sq.Ft. _Sq.Ft. Rooms Height Ft. 0 Projection I Finished/Living Bedrooms Stories Canopies Garage _Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Fioating Slab 0 Concrete Biock 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Peomit Not Required Flood Plain No Height Peomit Not Required Park Dedication Not Required /I Dwelling Units -----2 /I Structures -----2 Use/Nature SFRIlnstalling 4 replacement windows in existing openings' No structural work. ofWork HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1.050.00 Plan Approval $0.00 Peomit Fee Paid $26.00 Park Dedication $0.00 Issued By: Date OS/25/2006 Final/O.P. 00/00/0000 0 Penmit Voided I Parcelld /11504470000 In the perfonmance of this work I agree to perfonm all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this penmit application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 235 MORRIS ST Agent/Owner FOND DU LAC WI 54935 - 0000 Telephone Number 920-923-4189 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.